How to install building deformation joint device

点击数:1643 2016-01-26 Hits: 1643

Tools / raw materials

Deformation seam

2. Building deformation joint device

Steps / methods

1
First, reserve the slot processing
1. According to the model and specifications of the selected building deformation device, a slot that meets the installation requirements is reserved.
2. Clean up the construction base of the reserved groove to reach the appropriate width and depth, and ensure its flatness and straightness to place the building deformation device.
2
Second, the location of the deformation device loft
1. With the gap as the center, stake out the deformation device "W" symmetrically on both sides, and determine the position of the fixed aluminum alloy frame by the elastic line.
2. Use the same method to determine the position of the expansion barrier, and the spacing meets the requirements of the installation drawing.
3. Clean the grassroots.
3
Third, install fire resistance belt (optional)
Install fire resistance tape according to design requirements.
4
Fourth, flattened installation of the base layer of the water stop tape with 300g / m2 amount applied to the base layer and the surface of the water stop tape. When the adhesive is basically not cut, lay it flat and compact it.
When the water stop belt needs to be docked, apply 60g / m2 on both sides of the water stop belt with overlap adhesive. After the adhesive is fully dried, apply it for the second time
When the feet are dry so as not to stick to hands, flatten and compact.
5
Five, aluminum base installation
1. According to the determined position of the expansion tube, drill with an electric hammer and install the expansion tube.
2. Put the aluminum alloy base into the slot and adjust the design elevation so that the longitudinal slope and horizontal slope are consistent with the ground or wall.
3. Fix it with self-tapping screws.
6
6. Slide bar installation Lay out the slide bars according to the design pitch and fix them initially.
7
Seven, panel installation cover the panel, bolted. Decorative embedded marble or other materials (carpet, epoxy layer)
8
Eight, the installation of rubber strips, insert the rubber molding into the aluminum alloy cavity on both sides, pay attention to whether it is in place.
9
Nine, individual joints should be injected with glue and scraped.
10
X. Roof joints should be treated with joints.
END
Precautions

Notch preparation, installation, installation of fire resistance tape, flattening, installation of water stop, roof joint, pay attention to joint treatment